Tuesday, April 24, 2012

DIRTWORK 2012

DIRTWORK TASKS (Somewhat close to this order): (April - May 2012)


1.  RELOCATE ROCKS FROM BACKYARD SURPLUS PILE TO FRONT YARD FLOWER BEDS.  USE 2000 GMC TRUCK TO TRANSPORT.


2.  MOVE ROCK PILE (PURCHASED WITH THE PROPERTY) NEAR ROAD TO SHED PAD AREA.  USE RAVE BROTHERS BOBCAT.
 

3.  MOVE ROCK COLLECTION FROM NORTH SIDE OF GARAGE TO SHED PAD AREA.

4.  MOVE SURPLUS PILE OF ROCKS FROM BACKYARD TO SHED PAD AREA.


 SHED PAD AREA SHOWING ALL ROCKS COLLECTED AT THIS TIME:

5.  DIG UP LARGE RANDOMLY PROTRUDING ROCKS IN BACKYARD.

6.  DIG UP LARGE RANDOMLY PROTRUDING ROCKS FROM NORTH SIDE OF GARAGE.

7.  LEVEL FILLING OVER 400' WATER PIPE AREA.

8.  LEVEL FILLING OVER LEACH FIELD AT WEST END OF PROPERTY.

9.  BUILD UP SHED PAD WITH 12 TONS OF ROAD GRAVEL (AREA 16' X 24') - FIRST LOAD SHOWN.   SECOND LOAD WAS REQUIRED AS WELL (TOTAL OF 24 TONS).


10.  LEVEL OFF ROAD GRAVEL.


11.  FILL IN HOLES LEFT BY REMOVAL OF PROTRUDING ROCKS.  FRONT YARD REQUIRED A LOAD OF UNFILTERED DIRT FROM BOX ELDER/RAPID VALLEY.




13.  RAKE AREA ABOVE WATER PIPE FILL AND REMOVE MOWER DAMAGING ROCKS AND OTHER BIG ROCKS TOO.
14.  RAKE AREA ABOVE LEACH FIELD FILL AND REMOVE MOWER DAMAGING ROCKS.


15.  RAKE ALL OTHER AREAS DISTURBED BY ROCK REMOVAL AND/OR LEVELING OPS.

16.  PURCHASE SHED FROM ACE HOME CENTER AND WAIT FOR ITS DELIVERY.


PAINT DOORS TO MATCH GARAGE AND FRONT PORCH WOODWORK.